RM ECC energetically sprint one of the Structural Steel Fabrication & Projects Division, with its qualified and well experienced Engineers and Fabricators, executes the orders with the highest customer satisfaction level through competitive prices, high quality, on-time delivery and exceptional services.
This fabrication base support for various plant construction projects. The factory works as fabrication shop, maintenance shop, welding center for training of our welders and employees, and for qualification test of welders and obtaining approvals on welding procedures.
We fabricate plate and structural steel, piping. We also perform painting, blasting, post-weld heat treating, nondestructive examination and testing.
Certification and Approvals
RM ECC Structural Steel Fabrication & Projects Division is an ISO 9001:2008 certified for its Quality Management Systems and approved by leading Clients like Saudi Aramco, SCECO, SABIC, SWCC, Royal Commission.
Facility
- Total Work Area: 60000 Sq. m
- Covered Work Area: 30000 Sq. m
Major Services:
- Engineering, Detailing, Fabrication & Erection
Major Projects Focusing:
- Power Plants, Desalination Plants, Refineries & Petrochemical Industries
- Electrical Substations, Tower Fabrication and Erection
- Cement Plants, Paper Mills & Mining Industries
- Offshore Installation Support Structures for – Subsea Umbilical Riser & Flowline
- Offshore Installation Support Structures for – Platform & Foundation
- Offshore Diving Support – Installation Aids
- Offshore Pipeline – Pre-commissioning Support Installation Aids
Product and Services:
- Heat Exchangers
- Storage Tanks for Bulk liquids, Thermal Energy, Water, LNG, Steel Silos
- Ducting, Stacks & Chimneys
- Pressure Vessels
- Equipment Support Structures (Pump Base Plate, Winch Foundation, Skid Beam)
- Electrical Towers
- Vessel Platforms & Ladders
- Pipe spools
- Anchor Bolts
- Erection of Equipment & Structures
- Boiler tube bending
- Pipe conveyor fabrication
- RTU Shelter
- Girth Flange fabrication & machining
- Pipeline Conveyor System
- Belt Conveyors (Transfer Conveyors, Radial and Telescopic)
- Screw Conveyors (Tubular & U-Trough)
- Screw Feeders, Air Slides, Bucket Elevator & Drug Chain Conveyors
- Offshore SURF installation Aids
- Pipeline shore pull head, pipeline laydown/recovery/abandon head
- Pipeline Shrouds, Scrapper launcher and receiver heads
- Subsea Riser Clamps & Subsea Riser Guard/Frame
- Offshore Structure installation Aids
- Rigging platform, Out rigger, Walk way, Elevated Truss and other supporting structures
- Lifting spreader bar, heavy duty padeyes, trunnion, Crown shims
- Winch base plate, Pipeline Adopter, Guide frame
Fabrication Project in 2012: Fabrication of Chimney (Steel Structures)
Material |
Steel Structures - Chimney |
End User |
Arab Paper Manufacturing Company (WARAQ) |
Main Contractor |
Zamil Steel Holding Company Ltd |
Scope of Work |
Fabrication of Ø3m x 50m height chimney (10 Nos) |
Country & Year |
Saudi Arabia / Jun-2012 |
Fabrication Project in 2013: Fabrication of Remote Terminal Unit (RTU) Shelter
Material |
Remote Terminal Unit (RTU) with Instrumentation Stand |
End User |
Saudi Aramco Oil Company (SAOC) |
Main Contractor |
Siemens |
Scope of Work |
Fabrication of Remote Terminal Unit (RTU) Shelter & Stand |
Country & Year |
Saudi Arabia / Dec-2013 |
Fabrication Project in 2014: Fabrication of Storage Tanks
Material |
Structural Fabrication – Storage Tanks |
End User |
Marafiq |
Main Contractor |
Petroleum Chemicals & Mining Company (PCMC) |
Scope of Work |
Fabrication of storage tanks (API 650) 10 Nos |
Country & Year |
Saudi Arabia / May 2014 |
Fabrication Project in 2014: Fabrication of Stainless Steel Ducting Piping
Material |
Structural Mechanical Fabrication – Pipe Conveyors |
End User |
Saudi Seamless Pipe Factory |
Main Contractor |
ITQAN |
Scope of Work |
Fabrication of 12 Nos of Pipe Conveyors System |
Country & Year |
Saudi Arabia / May 2014 |
Fabrication Project in 2014: Fabrication of Storage Tanks for Lime
Material |
Structural Fabrication – Storage Tanks |
End User |
Marafiq |
Main Contractor |
Petroleum Chemicals & Mining Company (PCMC) |
Scope of Work |
Fabrication of storage tanks for Lime 2 x Nos |
Country & Year |
Saudi Arabia / May 2014 |
Fabrication Project in 2014: Fabrication of Stainless Steel Ducting Piping
Material |
Fabrication of Stainless Steel Ducting Piping |
End User |
Kemya (Sabic Affiliates) |
Main Contractor |
Tecnicas Reunidas, Saudi |
Scope of Work |
Fabrication of Stainless Steel Ducting Piping |
Country & Year |
Saudi Arabia / Oct-2014 |
Fabrication Project in 2015: Re-Tubing of Copper-Nickel Tube
Material |
Re-Tubing of Copper-Nickel Tube |
End User |
Saudi Kayan (Sabic Affiliates) |
Main Contractor |
Tecnicas Reunidas, Saudi |
Scope of Work |
Re-Tubing of Copper - Nickel Tube |
Country & Year |
Saudi Arabia / Aug-2015 |
Fabrication Project in 2018: Structural Fabrication – Storage Tanks
Material |
Structural Fabrication – Storage Tanks |
End User |
Saudi Aramco Total Refining and Petrochemical Co |
Main Contractor |
Tenova – The Techint Group |
Scope of Work |
Fabrication of 8 Nos API 650 storage tanks |
Country & Year |
Saudi Arabia / Jan-2018 |
Fabrication Project in 2019: Re-Tubing of U-Tube Exchanger
Material |
Re-Tubing of U-Tube Exchanger |
End User |
SADAF (Sabic Affiliates) |
Main Contractor |
Itqan |
Scope of Work |
Re-Tubing of U-Tube Exchanger |
Country & Year |
Saudi Arabia / Feb-2019 |